Equipment supply
‘Supply’ is the flow of resources used to satisfy a demand, such as materials, labour, information and skills – from a supplier to a user or consumer.
Equipment supply – in a construction sense – is the flow of equipment from a supplier to a site with the aim of facilitating the construction process. For example, the supply of an excavator to help dig the foundations, or a crane to lift heavy materials.
Very broadly, the term ‘equipment’ generally refers to apparatus that is used for specific purposes, e.g pumps are used to pump water, angle grinders are used to cut through hard materials. This is as opposed to individual tools such as screwdrivers, hammers and trowels which are instruments that are generally used by hand.
Usually, a contractor or sub-contractor orders the equipment from a supplier to complete a particular task. Because construction equipment can be very costly, and because it may sometimes be needed by a contractor or sub-contractor for only small duration during the year, it may be financially advantageous to hire the equipment only for the period it is required. This is not only cheaper for the contractor but also means the equipment does not require storage. Also, hiring the equipment means the contractor does not have to maintain it.
The following is a selection of typical equipment that may be supplied to a construction site:
- Access equipment.
- Attachments
- Bowsers
- Compressors
- Dumpers
- Forklifts/telehandlers
- Mixers
- Pumps
- Rollers
- Skips
- Topsoil screeners
- Wheeled excavators.
Equipment may also be required for inclusion in the building itself, for example; washing machines, coffee machines and scanning equipment, fume cupboards and so on.
In this case, it is important to identify equipment that will be provided by the contractor as part of the main contract and equipment which will be provided outside of the main contract (because the client may already have the equipment, or they may have existing suppliers). This is particularly important where equipment supplied outside of the main contract may have an impact on the construction works, perhaps needing to be accommodated in a certain location, or requiring fixing, power supply, air supply, water, drainage, telecommunications connection, etc.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.
The ISO answer to what is a digital twin
Talking about digital twins in a more consistent manner.
Top tips and risks to look out for.
New Code of Practice for fire and escape door hardware
Published by GAI and DHF.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, retrofit measures and the roles involved.
New alliance will tackle skills shortage in greater Manchester
The pioneering Electrotechnical Training and Careers Alliance.
Drone data at the edge: three steps to better AI insights
Offering greater accuracy and quicker access to insights.
From fit-out to higher-risk buildings.
Heritage conservation in Calgary
The triple bottom line.
College of West Anglia apprentice wins SkillELECTRIC gold.
Scottish government launch delivery plan
To strengthen planning and tackle the housing emergency.
How people react in ways which tend to restore their comfort.
Comfort is a crucial missing piece of the puzzle.
ECA launches Recharging Electrical Skills Charter in Wales
Best solutions for the industry and electrical skills in Wales.
New homebuilding skills hub launch and industry response
Working with CITB and NHBC to launch fast track training.